Our ADU Plumbing Process in Lakewood
ADU plumbing assessment begins before permit application with a site visit to review the proposed ADU floor plan, identify connection points to the existing supply and sewer systems, assess the condition of the existing sewer lateral (camera inspection recommended for original clay laterals), and confirm gas supply adequacy if the ADU will include gas appliances. We provide a written rough-in and finish estimate covering both phases of the plumbing work, and we clarify which items are included in the estimate versus which are allowances depending on final fixture selections.
During rough-in, we work in coordination with the general contractor or the homeowner acting as owner-builder, sequencing our work with framing, electrical, and HVAC as the permit requires. All plumbing rough-in is installed in accordance with the California Plumbing Code as adopted by the City of Lakewood. We schedule the City of Lakewood rough-in inspection, are present for the inspection to answer questions, and proceed to finish plumbing after the rough-in inspection passes and finishes are applied. Finish plumbing includes fixture installation, final connections, and functional testing of all fixtures before the project is closed out.